Repeat Violation- 2nd Floor tile/unlevel

The second floor tile in front of 2D and 2C door was missing broken for years. The HP Action and DHCR building-wide reduction finally forced it to be fixed at the end of November. Two evenings of work, the tenants egress was blocked without notice as they did dangerous demolition, cement and tile work. It is a shoddy job with gaps…the slope is still not fixed.

This image has an empty alt attribute; its file name is 2nd-floor-tile.gif